Showroom build continued (Stage 3)

Updated: Aug 22, 2023

Stage 3. We're almost there now.


An epic Aston Martin racing mural featuring Sir Stirling Craufurd Moss has been placed across the bi-fold doors.


The entire unit has now been painted. This includes the hallway entrance, the lounge area, the showroom and the new client toilet. The doors and skirting have also been painted.


The hallway has been carpeted using Wilton's British wool. The branded glass doors have also been fitted.


The bar area is now complete. We are now slowly filling this up with beer, spirits and champagne. The new customer toilet is also close to completion.


Our hand built bookcase has now been installed and has been filled with various reading materials collected over the years.


Various British made furniture pieces have been introduced. This includes a brown leather sofa and chair. Which has been partnered with a rosewood glass coffee table.


We are now in the process of hanging artwork on the walls and adding the finishing touches. We are getting close to unveiling the new showroom. However, you will have to wait a little bit longer.


I hope you all have a Merry Christmas.


James.